Jan 12, 2018

Construction update: The Rise is nearing seven storeys tall

Have you driven through Bridgwater Centre lately? We're nearing the top floor of precast installation, soon to reach our seven-storey height at The Rise!
Jan 11, 2018

No winter worries in a StreetSide condo

Love it or hate it, snow in Winnipeg is a heavy part of the winter experience.

It provides conversation fodder during waits in the grocery checkout line, arms us with some serious wilderness survival skills and lends us picturesque backdrops for quintessential Winnipeg winter activities, like skating the river trail.

But the Winnipeg snow also has a dark side. The dreaded post-snowstorm shovel puts a scowl on the faces of even the most enthusiastic of snow-lovers.

Dec 19, 2017

Precast Concrete Construction at The Rise

Driving down Centre Street in Bridgwater, you’ll catch a flurry of construction activity happening at The Rise Condominiums’ site – but the better part of the building is taking place offsite. Read on to learn more... 

 
Dec 15, 2017

Top tips to custom design your condo on a budget

It's not unusual for buyers to become overwhelmed with the selection (and the expense) that goes along with customizing your condo interior, but according to StreetSide's design consultant, it doesn’t need to break the bank. Read on for our top tips to stretch your budget further when finalizing your selections.